2005/CZ/16/C/PE/012 - Táborsko - Rectification of the State of Sewerage System in Taborsko Aglomeration in the Czech Republic

Táborsko - Rectification of the State of Sewerage System in Taborsko Aglomeration in the Czech Republic - foto 1Táborsko - Rectification of the State of Sewerage System in Taborsko Aglomeration in the Czech Republic - foto 2Táborsko - Rectification of the State of Sewerage System in Taborsko Aglomeration in the Czech Republic - foto 3Táborsko - Rectification of the State of Sewerage System in Taborsko Aglomeration in the Czech Republic - foto 4Táborsko - Rectification of the State of Sewerage System in Taborsko Aglomeration in the Czech Republic - foto 5Táborsko - Rectification of the State of Sewerage System in Taborsko Aglomeration in the Czech Republic - foto 6Táborsko - Rectification of the State of Sewerage System in Taborsko Aglomeration in the Czech Republic - foto 7Táborsko - Rectification of the State of Sewerage System in Taborsko Aglomeration in the Czech Republic - foto 8
Táborsko - Rectification of the State of Sewerage System in Taborsko Aglomeration in the Czech Republic

The goal of the project is to eliminate specific inadequacies of the Táborsko agglomeration sewerage system and the pertinent measures are solved within individual sub-projects. Ca 6 km of sewerage pipes will be constructed; ca 1 km of which will be a sewer tunnel and ca 18 km of sewers will be reconstructed, of which 0.4 km will be a sewer tunnel. 2 060 inhabitants will be newly connected to the sewerage system and to the WWTP. Furthermore, 7.4 km of water supply pipelines will be reconstructed and an accumulative capaTown of 4 190 m3 will be constructed for the sewerage system.

contractor: Sub-project A: Association Táborsko I (HOCHTIEF CZ a.s. and Metrostav a.s.)
Sub-project B: Association “Sdružení Táborsko II”, (HOCHTIEF a.s., facility Čechy o.z., Skanska CZ a.s., SWIETELSKY stavební s.r.o., branched facility and Dopravní stavby STŘED)
 
supervisor: Vodohospodářský rozvoj a výstavba a.s.

-

Total project cost:1 083 927 037 CZK
Total cost from the Financial Memorandum :18 753 743 EUR
Total eligible cost of the project:14 245 840 EUR
Total eligible cost from the Financial Memorandum :14 245 840 EUR
Rate of Cohesion Fund assistance:54%
Webpage of the project:http://www.dotacevst.cz/
Address of final beneficiary:Vodárenská společnost Táborsko, s.r.o.
Kosova 2894
390 02 Tábor