ISPA and Cohesion Fund 2004 - 2006
in the environmental sector

MANAGING AUTHORITY CF
INTERMEDIATE BODY CF
IMPLEMENTATING AUTHORITY CF

2003/CZ/16/P/PE/016 - Waste Management Brno

Waste Management Brno - foto 1Waste Management Brno - foto 2Waste Management Brno - foto 3Waste Management Brno - foto 4Waste Management Brno - foto 5Waste Management Brno - foto 6Waste Management Brno - foto 7Waste Management Brno - foto 8
Waste Management Brno

The project consists of reconstructing the Municipal Waste Disposal Plant in Brno. Above all, reconstructing the furnaces for incinerating mixed municipal waste and selected types of industrial waste, construction a sorting line for 10 000 tonnes of packaging waste a year, installing a steam turbine with air condensation for supplying electriTown to the national grid, reconstructing cinder management and installing a new combustion gas treatment system and chemical water treatment plant.

contractor: Association “CNIM - SIEMENS Konsorcium Odpadové hospodářství Brno” (Constructions Industrielles de la Méditerannée - CNIM, Société Anonyme and Siemens s.r.o.)
 
supervisor: "
    - Contemporary (from 1. 4. 2008): Tenza a.s. - Previous (until 31. 3. 2008): association “ORGREZ-E.ON-KWI” (ORGREZ, a.s., E.ON Engineering GmbH and KWI Consultants GmbH "

-

Total project cost:91 990 000 EUR
Total cost from the Financial Memorandum :70 408 000 EUR
Total eligible cost of the project:69 625 000 EUR
Total eligible cost from the Financial Memorandum :74 738 500 EUR
Rate of Cohesion Fund assistance:68%
Webpage of the project:http://www.ohb.cz
Address of final beneficiary:SAKO Brno a.s.
Jedovnická 2
628 00 Brno
ISPA and Cohesion Fund in the environmental sector - overview of successful projects in the Czech Republic
webpage map  |  print  |  webmaster
Created by EnviWeb s.r.o.