2001/CZ/16/P/PE/008 - Olomouc Sewer System Upgrading

Olomouc Sewer System Upgrading - foto 1Olomouc Sewer System Upgrading - foto 2Olomouc Sewer System Upgrading - foto 3Olomouc Sewer System Upgrading - foto 4Olomouc Sewer System Upgrading - foto 5Olomouc Sewer System Upgrading - foto 6Olomouc Sewer System Upgrading - foto 7Olomouc Sewer System Upgrading - foto 8
Olomouc Sewer System Upgrading

The project included partially reconstructing the existing sewerage system and partially constructing a new sewerage system. In the area of Slavonín – Nemilany, ca 15 km of sewers were built and the length of the public parts of household connections was about 8.8 km. Another stage was reconstructing and extending collector G, including one unloading chamber; the length of public parts of household connections was ca 0.5 km. Furthermore, the project also included reconstructing the collector F, where the sewer length was ca 2.0 km and the length of public parts of household connections was about 0.7 km. The final stage of the project was constructing collector B XVIII; the sewer length was ca 2 km and the length of public parts of household connections was about 0.6 km.

contractor: Association VCES-SKANSKA DS
 
supervisor: MVV/d plus

-

Total project cost:17 574 642 EUR
Total cost from the Financial Memorandum :14 672 000 EUR
Total eligible cost of the project:14 462 000 EUR
Total eligible cost from the Financial Memorandum :17 574 642 EUR
Rate of Cohesion Fund assistance:70%
Address of final beneficiary:Statutory Town of Olomouc
Horní náměstí
771 27 Olomouc