ISPA and Cohesion Fund 2004 - 2006
in the environmental sector

MANAGING AUTHORITY CF
INTERMEDIATE BODY CF
IMPLEMENTATING AUTHORITY CF

2001/CZ/16/P/PE/004 - Reconstruction of Drinking Water Supply System, Construction of Sewerage System, Reconstruction of Water Treatment and Waste Water Treatment in the Region of Podkrušnohoří (North Bohemia)

Reconstruction of Drinking Water Supply System, Construction of Sewerage System, Reconstruction of Water Treatment and Waste Water Treatment in the Region of Podkrušnohoří (North Bohemia) - foto 1Reconstruction of Drinking Water Supply System, Construction of Sewerage System, Reconstruction of Water Treatment and Waste Water Treatment in the Region of Podkrušnohoří (North Bohemia) - foto 2Reconstruction of Drinking Water Supply System, Construction of Sewerage System, Reconstruction of Water Treatment and Waste Water Treatment in the Region of Podkrušnohoří (North Bohemia) - foto 3Reconstruction of Drinking Water Supply System, Construction of Sewerage System, Reconstruction of Water Treatment and Waste Water Treatment in the Region of Podkrušnohoří (North Bohemia) - foto 4Reconstruction of Drinking Water Supply System, Construction of Sewerage System, Reconstruction of Water Treatment and Waste Water Treatment in the Region of Podkrušnohoří (North Bohemia) - foto 5Reconstruction of Drinking Water Supply System, Construction of Sewerage System, Reconstruction of Water Treatment and Waste Water Treatment in the Region of Podkrušnohoří (North Bohemia) - foto 6Reconstruction of Drinking Water Supply System, Construction of Sewerage System, Reconstruction of Water Treatment and Waste Water Treatment in the Region of Podkrušnohoří (North Bohemia) - foto 7Reconstruction of Drinking Water Supply System, Construction of Sewerage System, Reconstruction of Water Treatment and Waste Water Treatment in the Region of Podkrušnohoří (North Bohemia) - foto 8
Reconstruction of Drinking Water Supply System, Construction of Sewerage System, Reconstruction of Water Treatment and Waste Water Treatment in the Region of Podkrušnohoří (North Bohemia)

This project involved reconstructing a water treatment plant at Hradiště, a 6.2 km long water pipeline Železnice – Bílina, a WWTP at Jirkov with a design capaTown of 40 333 PE, a WWTP at Klášterec nad Ohří with a design capaTown of 18 330 PE, a WWTP at Kadaň with an estimated capaTown of 19 250 PE, a WWTP at Chomutov – Odlice with an estimated capaTown of 50 183 PE and a WWTP at Žatec with a design capaTown of 33 333 PE. The final part of the project involved reconstructing the Ústí nad Labem sewerage system; the total length of the new and reconstructed sections of the sewerage system will be 10.5 km.

contractor: Drinking Water: ISPA Hradiště-Consorcium SMP CONSTRUCTION a SOGEA SATOM
Reconstruction of WWTPs: Sdružení firem Podkrušnohoří – ČOV
Compl. Of the Sewerage System in Ústí nad Labe: Stavby silnic a železnic
 
supervisor: Babtie Group Limited (UK) + VOD-KA a.s. (Czech Republic) + HHP v.o.s. (Czech Republic)

-

Total project cost:28 798 000 EUR
Total cost from the Financial Memorandum :21 569 700 EUR
Total eligible cost of the project:19 800 500 EUR
Total eligible cost from the Financial Memorandum :28 465 688 EUR
Rate of Cohesion Fund assistance:65%
Address of final beneficiary:Severočeská vodárenská společnost a .s.
Přítkovská 1689
Teplice
ISPA and Cohesion Fund in the environmental sector - overview of successful projects in the Czech Republic
webpage map  |  print  |  webmaster
Created by EnviWeb s.r.o.