ISPA and Cohesion Fund 2004 - 2006
in the environmental sector

MANAGING AUTHORITY CF
INTERMEDIATE BODY CF
IMPLEMENTATING AUTHORITY CF

2000/CZ/16/P/PE/001 - Extension of the Sewerage System in Ostrava

Extension of the Sewerage System in Ostrava - foto 1Extension of the Sewerage System in Ostrava - foto 2Extension of the Sewerage System in Ostrava - foto 3Extension of the Sewerage System in Ostrava - foto 4Extension of the Sewerage System in Ostrava - foto 5Extension of the Sewerage System in Ostrava - foto 6Extension of the Sewerage System in Ostrava - foto 7Extension of the Sewerage System in Ostrava - foto 8
Extension of the Sewerage System in Ostrava

The goal of the project was to build about 17 km of sewerage collectors in the boundary areas of Ostrava; these collectors will allow these areas to be connected to the central WWTP and to a 1.6 km long collector in the Town centre also carrying energy and media networks and distribution systems that can be maintained without excavation.

contractor: Sewerage collectors completion: JV/C Ingstav Ostrava a.s., ŽS Brno,a.s. and Subterra a.s
Collector centre: JV/C Subbtera and Ingstav Ostrava
 
supervisor: JV/C Halcrow (GB) - Technoprojekt (CZ)

-

Total project cost:1 320 101 483 CZK
Total cost from the Financial Memorandum :40 720 168 EUR
Total eligible cost of the project:24 877 359 EUR
Total eligible cost from the Financial Memorandum :21 810 625 EUR
Rate of Cohesion Fund assistance:67%
Webpage of the project:http://www.ostrava.cz/
Address of final beneficiary:Statutární město Ostrava
Prokešovo náměstí 8
729 30 Ostrava
ISPA and Cohesion Fund in the environmental sector - overview of successful projects in the Czech Republic
webpage map  |  print  |  webmaster
Created by EnviWeb s.r.o.